Master Task List (Updated 04/06/09)

(Click Here To Go To Final Report)


Task

Team Responsible

Editor

Person Responsible

Resources

Status

1
Write: Executive Summary
Class
Grant (Part 1)
Grant
Assemble Full Report First, Summarize the report

2
Write: Introduction
Class
Riley (Part 2)
Riley
Assemble Background Section First, Summarize the Background Section
Hakoda-introduction-04-05-09.doc
3
Write: Conclusion
Class
Sara (Part 11)
Sara/Grant
Assemble Full Report First, Conclude the report

4
Write: Background History Section (History of Organization & Teen Project Organization)
Class
Riley (Part 2)
Riley
Get Background Information from Deanna, Jimmy, Mary Alice Evans
Done
5
Write: Background Main Issues Section
Class
Erda (Part 3)
Ashley
Wa'a Exercise, Kipuku Exercise, What Makes Waimanalo, Waimanalo Exercise
Done
6
Write Planning Process / Methodology Section (Stakeholders & Project Team, Steps, Timeline)
Class
Erda (Part 3)
Erda
Work Plans, Class Notes, Agendas
done
7
Wa'a Exercise - Compile Data
Governance & Programs
Sara(APPENDIX)
Hitomi/Sara
Wa'a Exercise
done
8
Wa'a Exercise - Analysis
Governance & Programs
Hitomi (Part 4 overview)
Hitomi/Sara
Wa'a Exercise
done
9
Kipuka Exercise - Compile Data
Governance & Programs
Sara (APPENDIX)
Hitomi /Erda/Ashley
Kipuka Exercise
done
10
Kipuka Exercise - Analysis
Governance & Programs
Hitomi (PART 4)
Hitomi/Erda
Ashley/Sara
Kipuka Exercise
done!
11
What Makes Waimanalo, Waimanalo Exercise - Compile Data
Governance & Programs
Sara (appendix)
Jon/Philip
What Makes Waimanalo, Waimanalo Exercise
done
12
What Makes Waimanalo, Waimanalo Exercise - Analysis
Governance & Programs
Hitomi (part 4)
Jon/Philip
What Makes Waimanalo, Waimanalo Exercise
in progress
13
Naming Exercise - Compile Data
Governance & Programs
Sara (appendix)
Sara
Naming Exercise Sheets
done
14
Visioning Results Presentation (For Adult Retreat)
Governance & Programs
Hitomi (part 4)
Naomi
All Visioning Exercises

15
Facilitate Process to write Vision Statement
Governance & Programs
Hitomi (Part 4)
Will and Sara
Steering Committee, All Visioning Exercises
done
16
Facilitate Process to write Mission Statement
Governance & Programs
Hitomi (Part 4)
Will and Sara
Steering Committee
done
17
Facilitate Process to decide on Name
Governance & Programs
Hitomi (Part 4)
Sara
Steering Committee
done but incomplete task
18
Facilitate Process to develop a list of goals for the organization
Governance & Programs
Hitomi (Part 4)

Steering Committee

19
Facilitate Process to develop a Strategic Development Plan
Governance & Programs
Hitomi (Part 4)

Steering Committee

20
Develop Leaseholder / Organizational Relationship Chart Options & Define Roles and Responsibilities
Governance & Programs
Grant (Part 5)
Grant
Ashley
Lease, Jimmy & Teen Project Board, Steering Committee

21
Coordinate with Deanna & Facilitate Process to choose Leaseholder / Organizational Relationship Option
Governance & Programs
NA
Grant
Lease, Jimmy & Teen Project Board, Steering Committee

22
Develop Organizational Structure Chart Options & Define Roles Responsibilities & Joint Agreements
Governance & Programs
Grant (Part 5)
Ashley, Grant, Hitomi
Steering Committee

23
Facilitate Process to choose Organizational Structure Option
Governance & Programs
Grant (Part 5)
Grant, Ashley


24
Facilitate Process to develop Charter & Bylaws
Governance & Programs
Grant (Part 5)
Grant


25
Develop Process to apply for 501(c) 3 status
Governance & Programs
Grant (Part 5)
Sara, Grant, Hitomi


26
Plan & Facilitate Roundtable Discussion at Adult Retreat
Governance & Programs
NA
DONE
DONE
DONE
27
Plan & Facilitate Large Group Discussion at Adult Retreat
Governance & Programs
NA
DONE
DONE
DONE
28
Identify Partner Organizations, Members & Users
Governance & Programs
Ashley (Part 6)
Hitomi, Ashley,(DAMON DID THIS and NAOMI typed it ?)
DAMON and NAOMI
DONE ?
29
Needs Assessment
Governance & Programs
Ashley (Part 6)
Ashley
Roundtable, Kipuka, Waa
Started
30
Programmatic Plan
Governance & Programs
Ashley (Part 6)
Ashley
Programmatic Plan
Started
31
Identify List of Programs & Descriptions
Governance & Programs
Ashley (Part 6)
Hitomi, Ashley
Damon, Naomi
Core Programs
Started by Naomi and Damon
32
Architectural Program: Identify Requirements of Sites for each Program
Class
Will
Sara (Help)

Not started
33
Capital improvement responsibility list and facilities maintenance list
Site Planning
Grant (Part 5)
Damon
Get from Damon
Not Started
34
Site Analysis: Draw Site Plan in CAD (Site)
Site Planning
Riley (Part 8)
Damon
Existing Site Drawings, Google, GIS, Site Survey
Complete
35
Site Analysis: Draw Site Plan in CAD (Vicinity)
Site Planning
Riley (Part 8)
Damon
Existing Site Drawings, Google, GIS, Site Survey
Not Started
36
Site Analysis: Wind Analysis
Site Planning
Riley (Part 8)
Philip

DONE please post
37
Site Analysis: Sun Study
Site Planning
Riley (Part 8)
Damon
Ecotech, Site Survey
Not Started
38
Site Analysis: Rainfall Data
Site Planning
Riley (Part 8)
Philip

Done (sara and Philip-placed rain graph inside floodway GIS)
39
Site Analysis: Geotechnical & Soil Data
Site Planning
Riley (Part 8)
Riley

Written by Riley- No map
40
Site Analysis: Topographical Data
Site Planning
Riley (Part 8)
Damon
Existing Site Drawings, GIS, Site Survey
In Process
41
Site Analysis: Flood Zone, Erosion & Site Drainage Study
Site Planning
Riley (Part 8)
Sara

Done, GIS (DRAINAGE SHOULD BE ADDED TO SITE CAD PLAN)
42
Site Analysis: Existing Structure Analysis
Site Planning
Riley (Part 8)
Damon
Existing Site Drawings, Site Survey
In Process
43
Site Analysis: Utilities - Electrical, Telecommunications, Plumbing, Sewer, Gas, CATV, Irrigation, Street Light Locations
Site Planning
Riley (Part 8)
Damon
Existing Site Drawings, Site Survey
In Process
44
Site Analysis: Vegetation
Site Planning
Riley (Part 8)
Sara

DONE (Philip- Added to Wind SITE PLAN)
45
Site Analysis: Site Access & Circulation, Local Transportation Systems
Site Planning
Riley (Part 8)
Will

In process with Jon
46
Site Analysis: Surrounding Cultural Areas & Historic Sites
Site Planning
Riley (Part 8)
Jon / Philip

Complete DONE, GIS SARA
47
Site Analysis: Surrounding Parks & Beaches
Site Planning
Riley (Part 8)
Jon / Philip

Complete, DONE GIS Sara
48
Site Analysis: Surrounding Schools, Hospitals, Churches, Community Centers, Post Offices, Government Buildings, Shopping Centers, Public Buildings, Pump Stations, Reservoir, etc.
Site Planning
Riley (Part 8)
Jon / Philip

In Process
49
Site Analysis: GIS Zoning Data
Site Planning
Riley (Part 8)
Sara

ZONING, Done, GIS
50
Site Analysis: GIS Tax Map Information
Site Planning
Riley (Part 8)
Sara

DONE, with TMK
51
Site Analysis: GIS Miscellaneous Map Data
Site Planning
Riley (Part 8)
Sara

DONE, Ahupua'a
52
Site Analysis: Arial Photography
Site Planning
Riley (Part 8)
Sara

DONE with TMK GIS
53
Site Analysis: Site Photography
Site Planning
Riley (Part 8)
Philip
PHILIP or Will, please help
DONE but not stiched
54
Site Analysis: General Site and Community Aesthetic, Feel & Culture
Site Planning
Riley (Part 8)
Will
paragraph and pictures of community
in process
55
Build a Site Model (1/32" Scale)
Site Planning
Riley (Part 8)
Damon
Existing Site Drawings, Site Survey
Not Started
56






57
Review: Waimanalo Regional Plan
Site Planning
Sara appendix
Riley

Done
58






59
Review: Development & Sustainable Communities Plans: KOOLAUPOKO
Site Planning
Sara appendix
Jon/Philip

Done
60
Review: Waimanalo Community Business Center Report
Site Planning
Sara appendix
Will

Done
61
Review: Office of Youth Services: Strategic Plan (?)
Site Planning
Sara appendix
Sara

In process
62
Review: City & County of Honolulu Land Use Ordinance
Site Planning
Sara appendix
Damon
LUO 2008
Done
63
Review: International Building Code 2003
Site Planning
Sara appendix
Damon
IBC 2003
In Process
64
Review: Environmental Impact Statement for Job Corps Site
Site Planning
Sara appendix
Riley

Done
65
Plan / Facilitate Youth Retreat Charrette
Site Planning
NA
Damon
Planner's Web Charrette Site
The National Charrette Institute

Complete
66
Youth Retreat Charrette - Compile Data (Written Document w/ Photos)
Site Planning
Vision? Hitomi??
Will
Youth Retreat Results
DONE
67
Youth Retreat Charrette - Compile Data (On Site Plan)
Site Planning
NA
Damon
Youth Retreat Results
Complete
68
Youth Retreat Charrette - Analyze Data (Written Document)
Site Planning
Vision ?? Hitomi??
Sara
Youth Retreat Results
In Process
69
Youth Retreat Charrette - Analyze Data (On Site Plan)
Site Planning
NA
Damon
Youth Retreat Results
In Process
70
Plan / Facilitate Adult Retreat Charrette
Site Planning
NA
Damon
Youth Retreat Results
Planner's Web Charrette Site
The National Charrette Institute

DONE
71
Adult Retreat Charrette - Compile Data
Site Planning
NA
Sara
Adult Retreat Results
ALMOST DONE
72
Adult Retreat Charrette - Analyze Data
Site Planning
Vision?? Hitomi???
Sara and Will
Adult Retreat Results
In Process
73
Design Parameters: Create Architectural Program Chart (List each functional space, use, square footage, adjacencies, materials / finishes, feelings, etc.)
Site Planning
Will (Part 9)
Damon
Sara willing to help

Waimanalo-Program.xls
Waimanalo-Program.pdf
74
Design Parameters: Facilitate / Create Bubble Diagram
Site Planning
Will (Part 9)
Sara willing to help

Waimanalo-BubbleDiagram.pdf
75
Design Parameters: Environmental Sustainability Review / LEED Feasibility Study
Site Planning
Will (Part 9)
Damon
USGBC
Not Started
76
Design Parameters: Structural Requirements
Site Planning
Will (Part 9)
Sara willing to learn and Help


77
Design Parameters: Site Utility Requirements (Mechanical, Electrical, Plumbing)
Site Planning
Will (Part 9)
Sara willing to learn and help


78
Design Parameters: Materials, Finishes & Equipment
Site Planning
Will (Part 9)
Sara willing to learn and help


79
Design Solution: Create Architectural Schematic Drawings based on Design Parameters
Site Planning
Damon (Part 10)
Sara willing to learn and help


80
Design Solution: Create Architectural Model
Site Planning
Damon (Part 10)
Damon

Not Started
81
Assemble Final Document in InDesign and Produce a PDF
Class
Grant
Grant
InDesign
In Process